Friday, 16 August 2013

Delhi Metro Detail Of Phase-III & Phase-IV- (Noida, Greater Noida Ghaziabad Faridabad ,Meerut in National Capital Region of India) Call +91-9711033176

Delhi Metro is a rapid transit system serving Delhi, Gurgaon, Faridabad, Noida, and Ghaziabad in the National Capital Region of India. Delhi Metro is the world's 13th largest metro system in terms of length





Metro Route Of Phase- I




LineStationsLength
(km)
Term
inals
No. of interchanges
planned
     Yellow Line extension34.48JahangirpuriBadli0
     Violet Line79.36Central SecretariatKashmere Gate2
1113.875BadarpurYMCA chowk, Faridabad0
     Blue Line branch45.5DwarkaNajafgarh1
     Green Line611.182MundkaBahadurgarh0
Inner Ring Road Line (Line 7)[69]3758.40MukundpurShiv Vihar10
Outer Ring Road Line (Line 8)2637.25Janakpuri WestBotanical Garden4
Total92140.04717

Properties In India : 

The Noida authority board on Monday approved four new Metro lines. These four lines are in addition to the already proposed Noida to Greater Noida line. All the routes put together will improve connectivity between the twin cities and make travel to and from Delhi smoother, besides allowing people to move within Noida and Greater Noida in a much better way.


The Noida board has also approved a direct Metro link between Noida and Delhi’s Sarita Vihar. It’s a 3.76-km Metro route between Noida’s Botanical Garden and Kalindi Kunj near Sarita Vihar.
The Delhi Metro Rail Corporation (DMRC) has submitted a detailed project report (DPR) which puts the total cost at Rs 786 crore.


This 3.76-km line will be part of DMRC’s larger plan to link Jahangirpuri and Kalindi Kunj. A DPR for the entire plans has been prepared too.


4 new Metro lines approved - Hindustan Times

Properties In  India Present Metro Detail In NCR

The Noida, Greater Noida and Yamuna Expressway authorities on Monday have planned for large scale infrastructure development across Gautam Budh Nagar district. In a joint board meeting, the major focus of the Authorities remained on providing connectivity within the district as well as with Delhi. "In the next four years, Rs 20,000 crore will be spent on the projects," said Mohinder Singh, chairman of the Authorities.

To begin with, the authorities have approved a major detailed extension of the Metro route connecting almost all of Noida and Greater Noida at a cost of Rs 10,000 crores, covering a total of 86 km. The route is estimated to be ready in the next three years.

Besides extending the existing city centre Metro route connecting Kalindi Kunj and Botanical Garden, a new line from the City Centre station in sector 32 to sector 62, touching NH-24, was also approved. This new 6-km route will be via sector 71 crossing and will provide connectivity to sectors 32, 34, 35, Hoshiarpur, sectors 51, 52, 71, Greater Noida Extension Marg, Sarfabad, sectors 60, 61, 62, 63 and NH 24.

A new loop from sector 71 via sector 121 will then join the Greater Noida route between the City Centre and Bodaki railway station in Greater Noida. This route will be from City Centre along the Greater Noida Expressway, touching Knowledge Park 4 via Pari Chowk and will finally end at Bodaki. The new loop has been added mainly to connect Noida extension that falls near sector 121 with Noida as well as with Greater Noida.

"With the Metro extension, most sectors will be within walking distance from the stations. Connectivity to Greater Noida will also improve tremendously," Singh said.

To smoothen chaotic traffic, the Noida Authority has approved construction of a 5.8 km elevated road parallel to the Shahdara drain. Starting from sectors 14 and 14 A onto sector 95 and Kalindi Kunj, the stretch costing Rs 525 crores will be of four lanes. This route will provide an alternate route between Kalindi Kunj and Noida, thus easing traffic congestion on the expressway.

In the meeting, the Authorities also approved the draft master plan for Greater Noida. As per the 2031 Master Plan, a total of 5,04,000 hectares will be developed. Of this, 27.6 per cent area will be reserved for residential development, while 24.2 per cent will be developed as green area. The approved master plan includes six expressways, overbridges, flyovers, warehouses and godowns, besides several residential, educational, industrial and commercial hubs.

According to the Authority chairperson, development of these 5,04,000 hectares is crucial as it falls between two major hubs of commercial activity, the eastern freight corridor between Ludhiana and Kolkata and the western freight corridor between Dadri and 
Mumbai.

A state-of-the-art Buddhist museum and a research centre sprawling across 25 acres within the Gautam Budh University campus was also approved in the Monday board meeting. Estimated to cost Rs 84 crores, the project will house art galleries and sculpture sections and various cultural workshops will also be held there.

For entertainment and leisure of residents, the Authority plans to construct a modern Laser Park in sector 91. Measuring 29 acres, this park will cost Rs 20 crores and will be the first of its kind in the NCR. It will boast a 3-acre artificial water body, computerized lighting systems besides musical fountains, an amusement area, a marine aquarium, open theatres and walking pathways
.





The new routes are: 

From City Centre to NH-24 via Sector 71 (covering a major part of the city), from Sector 71 to Bodaki in Greater Noida via Sector 121 (this covers the Noida Extension area), from Kalindi Kunj to Botanical Garden (connecting Noida to South Delhi) and from Sector 94/124 to Sector 142 via Sector 44 (allowing Greater Noida residents to go to South Delhi without coming to Noida).

Though Metro has proved to be a great relief, intra-city connectivity continues to be a problem. A city of more than 150 sectors, there are only six stations in Noida, catering only to nine immediate and as many adjoining sectors.





Metro Route Of Phase- III -2016


Other than these approved lines, there are several other proposed lines which are awaiting approval for inclusion in Phase III.These line extensions are:



LineStationsLength
(km)
TerminalsNo. of interchanges
planned
     Blue Line branch56Noida City CentreNoida Sector 620
     Airport Express511.63Dwarka Sector 21IFFCO Chowk1
     Red Line69.6Dilshad GardenNew Bus Stand, Ghaziabad0
     Red Line612RithalaBawana0
Total39.231



.












Metro Route Of Phase- IV -2021

Phase IV has a 2021 deadline, and tentatively includes further extensions to Sonia Vihar, Burari, Mukundpur, Reola Khanpur, Palam, Najafgarh, Narela, Ghazipur, Noida sector 62, extensions of Violet line, Green line, Line 8, having a total length of over 100 km. There might be some changes in plan before actual construction starts on these lines.