Plot
A home is a tender touch of belongingness, a distinct sense of joy and a complete feeling of a good life. Every residence in Wave City has been designed keeping these elements in mind. Plot sizes of 112.5, 162, 240, 450 and 800 sq mts are available for you to develop your dreams into reality.
ALLIED CHARGES:
A) Preferential location charges (PLC):
B) PLC at the rate of 10% of BSP would be charged over & above normal PLCs for plots facing sector roads (30 meter & above) plus corner or park facing also.
C) Other Charges will be Extra.
A) Interest Free Development Linked Installment Plan
B) PERIPHERAL CHARGES PAYMENT PLAN
E) PREMIUM CHARGES: As& when demanded by developer.
Note:
SECTOR | PLOT AREA | PLOT RATE PER | |
SQ MTR | SQ YARD | SQ YARD | |
S4 | 240 | 287.04 | 23000 |
S6 | 162 | 194 | 21000 |
S7 | 162 | 194 | 21000 |
ALLIED CHARGES:
A) Preferential location charges (PLC):
- Plots facing park
- Plots facing green belt
- Corner Plots / Two side open plots
- Plots facing18mtr wide road or above
S No | Particulars | Percentage of Basic Price |
1 | Single PLC | 3% |
2 | Double PLC | 5% |
3 | Triple PLC | 7% |
B) PLC at the rate of 10% of BSP would be charged over & above normal PLCs for plots facing sector roads (30 meter & above) plus corner or park facing also.
C) Other Charges will be Extra.
A) Interest Free Development Linked Installment Plan
S No | Particulars | Installments |
1 | On Booking | 10% |
2 | Within 45 days from date of allotment | 10% |
3 | Within 105 days from date of allotment | 10% |
4 | Within 195 days from date of allotment | 10% |
5 | Within 280 days from date of allotment | 10% |
6 | Within 365 days from date of allotment | 10% |
7 | On Laying of road in front of the allotted Plot | 10% |
8 | On Laying of water line in front of the plot | 10% |
9 | On Laying of electric cable in front of the plot | 10% |
10 | At the time of offer of possession | 10% |
Note : 1. The development linked stages can be called for payment in any sequence irrespective of the sequence mentioned hereinabove | ||
2. PLC will be clubbed with the basic Sale Price. |
B) PERIPHERAL CHARGES PAYMENT PLAN
Sl No | Particulars | Installments |
1 | Within 90 days from the date of allotment | 25 % |
2 | Within 180 days from the date of allotment | 25 % |
3 | Within 270 days from the date of allotment | 25% |
4 | Within 360 days from the date of allotment | 25% |
E) PREMIUM CHARGES: As& when demanded by developer.
Note:
- Cheques/Bank Drafts to be issued in favour of “Wave City NH-24” payable at New Delhi only. Outstation cheques shall not be accepted
- In the event the government / competent authority levies additional charges on account of peripheral charges, infrastructure development charges or any other charges payable in relation to the project, the same shall be charged pro-rata on plot size from the customers .
- The Stamp Duty, Registration fee, miscellaneous charges, IFSD & other charges (if applicable) are not included & shall be paid at the time of offer of possession
0 comments:
Post a Comment